Sinkhole/Planter Repairs Services DMV HQ Parking lot E
Sector: Water Supply and Storage • Location: Sacramento, California, United States of America
Source: Dodge USA
Sinkhole/planter repairs services at the DMV Headquarters (HQ) Parking lot E. SUMMARY OF WORK (1). Investigate and repair of the area around the sinkhole: a. Sawcut and excavate sunken pavement in roughly fifty (50) square feet (SF) area to provide full repair. b. Remove and off haul roughly twenty-six (26) linear feet (LF) of the existing concrete planter curb. c. Remove and off haul existing pla
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Commercial, Car parking, Waste Processing and Treatment, Road, Automotive
- Location
- Sacramento, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sinkhole/Planter Repairs Services DMV HQ Parking lot E
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sinkhole/planter repairs services at the DMV Headquarters (HQ) Parking lot E. SUMMARY OF WORK (1). Investigate and repair of the area around the sinkhole: a. Sawcut and excavate sunken pavement in roughly fifty (50) square feet (SF) area to provide full repair. b. Remove and off haul roughly twenty-six (26) linear feet (LF) of the existing concrete planter curb. c. Remove and off haul existing planter soil. d. Investigate the excavated area for the root cause of the sink hole. e. Place 3/4 ba... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Sacramento |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Commercial, Car parking, Waste Processing and Treatment, Road, Automotive |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
