Sinohydro Kafue Gorge Lower HPP

Sector: Hydro • Location: Zambia

Source: World Bank Group

Project
Active

The China Africa Development Fund and Sino Hydro, as well as the Zambian power utility Zesco Corporation in a Joint Venture, were planning the development of the 600MW Kafue Gorge Lower Hydropower Plant, Kafue River Basin, 65km upstream from confluence of Kafue river and Zambezi river.

Commissioning was expected for 2017. Construction was expected to start in April 2011. Prefeasibility work had b

Status
Prospective
Sector
Hydro, Water Supply and Storage, Power Transmission, Government, Power Generation (CCGT), Commercial
Location
Zambia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Sinohydro Kafue Gorge Lower HPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sinohydro Kafue Gorge Lower HPP” is an infrastructure initiative in the Hydro sector, located in Zambia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The China Africa Development Fund and Sino Hydro, as well as the Zambian power utility Zesco Corporation in a Joint Venture, were planning the development of the 600MW Kafue Gorge Lower Hydropower Plant, Kafue River Basin, 65km upstream from confluence of Kafue river and Zambezi river. Commissioning was expected for 2017. Construction was expected to start in April 2011. Prefeasibility work had been done in 1975, based ona 450MW design. This was continued in 1994-5. The Ministry of Water Development received 11 expressions of interest, from: Sinohydro; China Gezhouba Group; SN Power; Alstom Power; Sithe Global; VINCI Group; CMC Di Ravenna; International Mineral Resources BV; Noesis Strategic Consulting; CEC, but some have withdrawn due to the financial crisis. Construction officially started in July 2011. Commissioning was expected for 2017. The project was estimated to cost $1.5 billion, of which the first $1.0 billion was to be provided by a loan of the China Development Bank. The remaining $500 million was to be provided in equity. The IFC was appointed as lead advisor. http://www.hydroworld.com/index/display/article-display/1057346354/articles/hrhrw/regulationandpolicy/general/2010/07/zambia_-chinese_firms.html http://www.hydrosustainability.org/getattachment/495d3e8f-b18a-42e1-b47f-87c02585c07b/Israel-Phiri--Kafue-Gorge-Lower-Project.aspx http://www.zambiananalysis.com/index.php?option=com_content&view=article&id=63:layman-s-guide-to-the-kafue-gorge-lower&catid=1:latest&Itemid=128 http://www.lusakatimes.com/2011/07/21/rb-commissions-2bn-kafue-gorge-hydroelectric-power-station/

Original sector

Energy

Budget

Location

Country

Zambia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Water Supply and Storage, Power Transmission, Government, Power Generation (CCGT), Commercial

Article published date

2024-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project