Sinohydro Kafue Gorge Lower HPP

Sector: Water Supply and Storage • Location: Zambia

Source: World Bank Group

Project
Active

The China Africa Development Fund and Sino Hydro, as well as the Zambian power utility Zesco Corporation in a Joint Venture, were planning the development of the 600MW Kafue Gorge Lower Hydropower Plant, Kafue River Basin, 65km upstream from confluence of Kafue river and Zambezi river.

Commissioning was expected for 2017. Construction was expected to start in April 2011. Prefeasibility work had b

Project Information FAQ

Project Information

5 Q
The project “Sinohydro Kafue Gorge Lower HPP” is an infrastructure initiative in the Water Supply and Storage sector, located in Zambia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The China Africa Development Fund and Sino Hydro, as well as the Zambian power utility Zesco Corporation in a Joint Venture, were planning the development of the 600MW Kafue Gorge Lower Hydropower Plant, Kafue River Basin, 65km upstream from confluence of Kafue river and Zambezi river. Commissioning was expected for 2017. Construction was expected to start in April 2011. Prefeasibility work had been done in 1975, based ona 450MW design. This was continued in 1994-5. The Ministry of Water Development received 11 expressions of interest, from: Sinohydro; China Gezhouba Group; SN Power; Alstom Power; Sithe Global; VINCI Group; CMC Di Ravenna; International Mineral Resources BV; Noesis Strategic Consulting; CEC, but some have withdrawn due to the financial crisis. Construction officially started in July 2011. Commissioning was expected for 2017. The project was estimated to cost $1.5 billion, of which the first $1.0 billion was to be provided by a loan of the China Development Bank. The remaining $500 million was to be provided in equity. The IFC was appointed as lead advisor. http://www.hydroworld.com/index/display/article-display/1057346354/articles/hrhrw/regulationandpolicy/general/2010/07/zambia_-chinese_firms.html http://www.hydrosustainability.org/getattachment/495d3e8f-b18a-42e1-b47f-87c02585c07b/Israel-Phiri--Kafue-Gorge-Lower-Project.aspx http://www.zambiananalysis.com/index.php?option=com_content&view=article&id=63:layman-s-guide-to-the-kafue-gorge-lower&catid=1:latest&Itemid=128 http://www.lusakatimes.com/2011/07/21/rb-commissions-2bn-kafue-gorge-hydroelectric-power-station/

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data