logo

Sintering process role in the (partial) transition to the Direct Reduction Route.

Sector: Steel • Location: Belgium, Netherlands, France, Italy, Spain

Source: EU Funding & Tenders Portal

Project
Ongoing

To comply with the European Green deal (14/07/2021 – key target 2030 : at least 55% cuts in greenhouse gas emissions – from 1990 levels), European steelmakers using the Blast Furnace (BF) route are considering a transition to direct reduction (DR) route, first fed by natural gas then by hydrogen when available in sufficient quantity. For this 2030 target, only a part of the existing BF's will be r

Project Information FAQ

Project Information

3 Q
The project “Sintering process role in the (partial) transition to the Direct Reduction Route.” is an infrastructure initiative in the Steel sector, located in Belgium, Netherlands, France, Italy, Spain. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

To comply with the European Green deal (14/07/2021 – key target 2030 : at least 55% cuts in greenhouse gas emissions – from 1990 levels), European steelmakers using the Blast Furnace (BF) route are considering a transition to direct reduction (DR) route, first fed by natural gas then by hydrogen when available in sufficient quantity. For this 2030 target, only a part of the existing BF's will be replaced by DR shafts. TRANSinter investigates solutions to support this first transition step based on the valorization of the existing sinter plants (and of their existing efficient fumes de-dusting). Following solutions will be investigated : - Adapted sinter for use in DR shafts : as an alternative to DR grade pellets in line with the future low availability of the required iron ores. - Increased recycling rate : due to closure of sinter plants, by-products input in the remaining ones will need to increase but also new by-products (from the DR route) will have to be recycled. Impact on the process will be assessed and countermeasures investigated. - Cleaner sintering process during the transition: o Conversion of low quality residues from other sectors into bio-coals of reliable quality for being used as carbon sources; o Assessment of process actions to mitigate critical pollutant emissions; o Assessment of end-of-pipe treatments, not yet applied to sintering process fumes, for abatement of critical pollutant emissions a.o. linked to increased recycling rate; o ‘Zero Emission Sintering’ original lay-out for minimizing the off-gas flow (10 to 20 x lower) and the same for the CO2 and other pollutant emissions. All those solutions will be investigated using the facilities available amongst the consortium, consisting in lab trials, modeling work and finally at pilot scale (sinter pot trials) followed by an exhaustive characterization (standards and more representatives) of the produced sinter for full understanding of the impact on BF and DR processes.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data