SIPCO power plant
Sector: Natural Gas • Location: Thailand
Source: World Bank Group
In the mid-1990s, Siam Power Generation Public Co. Ltd (SIPCO) was awarded a license, under the Small Power Producer (SPP) generation program by Electricity Generation Authority of Thailand (EGAT), to build, own and operate a 450MW gas-fired combined cycle power plant in the SSP Industrial Park in the Rayong Province, with the estimated cost of USD 223.875 million. However, the 1997 financial cris
- Status
- Prospective
- Sector
- Natural Gas, Car parking, Power Generation (CCGT), Government, Manufacturing (Industrial), Automotive, Commercial
- Location
- Thailand
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SIPCO power plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In the mid-1990s, Siam Power Generation Public Co. Ltd (SIPCO) was awarded a license, under the Small Power Producer (SPP) generation program by Electricity Generation Authority of Thailand (EGAT), to build, own and operate a 450MW gas-fired combined cycle power plant in the SSP Industrial Park in the Rayong Province, with the estimated cost of USD 223.875 million. However, the 1997 financial crisis delayed the implementation of the project. In 2005, M-Power TT Ltd, a joint venture between Melewar Industrial Group Bhd (75%) and Transturbo Engineering Sdn Bhd (25%), acquired a 55% stake in the SIPCO. In July 2008, SIPCO signed a multi-tranche facility to finance the construction, operation and maintenance of the power plant. In November 2008, Melewar Industrial Group Bhd acquired additional stake in SIPCO, bringing its total interest in the power project to 95.03%. The project was divided into two stages. The first phase would involve the construction of a 185MW combined cycle gas-fired power plant, which was expected to be in operation by 2009. SIPCO also submitted plans for the second phase of the plant to Thai authorities for the expansion of its production capacity by another 90MW at between USD 100 million (RM330 million) and USD 120 million. The plant is expected to generate some USD 100 million revenue for Melewar once completed. |
Original sector | Energy |
Budget |
Location
Country | Thailand |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Natural Gas, Car parking, Power Generation (CCGT), Government, Manufacturing (Industrial), Automotive, Commercial |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
