logo

Sir Leo Hielscher Bridges, Queensland

Source: Road Traffic Technology

Project
Closed

The Gateway Bridge. The twin bridge under construction. Sir Leo Hielscher Bridges from south bank of the Brisbane River. The Sir Leo Hielscher Bridges are a pair of bridges located on the Gateway Motorway in Brisbane, Australia. They are operated and maintained by Queensland Motorways, which is owned by the Queensland Government. The project involved the refurbishment of the existing Gateway Bridg

Project Information FAQ

Project Information

5 Q
The project "Sir Leo Hielscher Bridges, Queensland" is an infrastructure initiative in the Advanced Electronics, Airport, Bridge, Cement, Automotive, Government, Seaport, Steel, Road, Metal sector, located in N/A, Thailand. Taiyo aggregates data from Road Traffic Technology, including information on sponsoring government bodies, EPCs, and contractors.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Gateway Bridge. The twin bridge under construction. Sir Leo Hielscher Bridges from south bank of the Brisbane River. The Sir Leo Hielscher Bridges are a pair of bridges located on the Gateway Motorway in Brisbane, Australia. They are operated and maintained by Queensland Motorways, which is owned by the Queensland Government. The project involved the refurbishment of the existing Gateway Bridge and the construction of a new bridge, which was completed in May 2010. The bridges are named after Sir Leo Hielscher, chairman of the Queensland Treasury Corporation. A growth in traffic necessitated the construction of a duplicate bridge alongside the Gateway Bridge. The construction of the bridge is part of an upgrade project announced in 2005. The A$1.88bn project included the upgrade of the Gateway Motorway. The upgrade involved widening 16km of road from four to six lanes towards the south. This stretch was opened in August 2010. Six lanes were constructed in the north between the Gateway Bridge and Nudgee Road. A 7km Gateway Motorway deviation, which provides a second means of access to the Brisbane Airport, is due to be built. The upgrade works in the south include improvements to the Port of Brisbane Interchange, Lytton Road to Wynnum Road, the Wynnum Road Upgrade, Wynnum Road to Old Cleveland Road, Old Cleveland Road to Mt Gravatt-Capalaba Road and Mt Gravatt-Capalaba Road to Miles Platting Road. In 1978, the Queensland Government called for tenders for the construction of a bridge across the Brisbane River. Construction of the A$140m Gateway Bridge started in June 1980. The bridge was officially commissioned in January 1986. Construction of the duplicate bridge started in March 2007 and it was opened in May 2010. Refurbishment works on the old bridge started in June 2010. The twin bridge contract is valued at $350m. The bridges are expected to carry 12 lanes of traffic. In early 2010 it was estimated that the single bridge carries approximately 100,000 vehicles a day. The engineers designed the old Gateway Bridge to resist exposure to a wide range of environmental conditions. The bridge is estimated to have a life of 300 years. As a security measure, 3m-high fencing was attached to the top of the concrete traffic barrier in order to prevent accidents. The old Gateway Bridge is 1,627m long and is divided into three approaches: southern, northern and central. The new bridge in the north is 64.5m high and stretches 1.63km across the Brisbane River. The bridge features 748 concrete segments, which are supported by 17 piers. The bridge construction required 157,000t of concrete and 11,600t of reinforced steel. The contractors faced challenges in procuring raw materials to the site. The engineers had difficulty in constructing the bridge below 80m in height but above 55m to meet air traffic and shipping navigation requirements. Long viaducts with tall piers were used to overcome this challenge. Transfield constructed the initial bridge in June 1980. Leighton Abigroup Joint Venture designed and constructed the twin bridge.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data