logo

Siranjganj Power Company

Sector: Bridge • Location: Bangladesh

Source: International Finance Corporation (IFC)

Project
Active

International Finance Corporation (“IFC”) is considering up to US$ 110 million of debt financing for the construction of a greenfield 414 MW (net capacity) dual-fuel (gas and high speed diesel, “HSD”) combined cycle power plant to be located in Sirajganj, Bangladesh (“the Project”). The Project will be developed by a consortium of Sembcorp Utilities Pte. Ltd. (“Sembcorp Utilities” or “Sponsor”)

Project Information FAQ

Project Information

5 Q
The project “Siranjganj Power Company” is an infrastructure initiative in the Bridge sector, located in Bangladesh. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

International Finance Corporation (“IFC”) is considering up to US$ 110 million of debt financing for the construction of a greenfield 414 MW (net capacity) dual-fuel (gas and high speed diesel, “HSD”) combined cycle power plant to be located in Sirajganj, Bangladesh (“the Project”). The Project will be developed by a consortium of Sembcorp Utilities Pte. Ltd. (“Sembcorp Utilities” or “Sponsor”) and North West Power Generation Company Ltd. (“NWPGCL”) under a special purpose vehicle which will be established in Bangladesh for the sole purpose of developing and operating the Project (“Project Company”). The 414MW power plant will include one Gas Turbine (GT) unit; one set of heat recovery steam generator; one steam turbine generating unit with associated auxiliary equipment; fuel gas transportation, compression and conditioning system; HSD system; cooling water system; and water treatment facility. A 230 kV substation connects the complex to the national transmission system and the 30” East-West gas pipeline crossing the Jamuna Bridge is located 1.6 km away from the site. . Construction is targeted to start in the second quarter of 2016 and be completed in approximately 27 months, with combined cycle commercial operations targeted to commence by August 2018. A consortium of EPC contractors will be appointed to undertake the engineering, procurement and construction activities of the project. The Operation and Maintenance of the project will be undertaken by the Project Company with the support of a long term service agreement for the GT with the manufacturer. The Sirajganj site was developed as a major power generation complex in the north-west region of Bangladesh; NWPGCL is already operating a 225MW plant within the same complex and will shortly commence construction of another project there in early 2016. The Project will thus be the third power project to be located within the Sirajganj complex.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data