Siren Elementary School - Playground Redevelopment
Sector: Commercial • Location: Siren, Wisconsin, United States of America
Source: Dodge USA
CONTRACT A G ENERAL SITE CONSTRUCTION 1. Site improvements with work including, but not limited to; erosion control, demolition, earthwork, storm sewer utilities, dense graded base, concrete flatwork, concrete curbing, asphalt paving, and landscaping restoration. 2. Alternate Bids, if any, as represented in the Contract Documents. 3. All necessary work to complete the proposed contract as represen
- Status
- Prospective
- Sector
- Commercial, Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Education, Power Generation (CCGT)
- Location
- Siren, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Siren Elementary School - Playground Redevelopment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CONTRACT A G ENERAL SITE CONSTRUCTION 1. Site improvements with work including, but not limited to; erosion control, demolition, earthwork, storm sewer utilities, dense graded base, concrete flatwork, concrete curbing, asphalt paving, and landscaping restoration. 2. Alternate Bids, if any, as represented in the Contract Documents. 3. All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR S bid. WORK BY OTHERS Work ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Siren |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Education, Power Generation (CCGT) |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
