logo

Sirius Minerals Yorkshire Polyhalite Project Tunnelling Contract

Sector: Fertilizers • Location: Whitby, England

Source: Highways Today

Project
Ongoing

Sirius Minerals Plc. has hired the European construction group STRABAG SE to build an approx. 13 km tunnel section for the underground transport system of the Woodsmith Mine near Whitby, England. The design-and-build contract was signed on 28 March. The Woodsmith Mine will begin extraction from the world’s largest deposit of polyhalite, a mineral used in the production of fertilizer, in 2021. The

Project Information FAQ

Project Information

5 Q
The project “Sirius Minerals Yorkshire Polyhalite Project Tunnelling Contract” is an infrastructure initiative in the Fertilizers sector, located in Whitby, England. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Sirius Minerals Plc. has hired the European construction group STRABAG SE to build an approx. 13 km tunnel section for the underground transport system of the Woodsmith Mine near Whitby, England. The design-and-build contract was signed on 28 March. The Woodsmith Mine will begin extraction from the world’s largest deposit of polyhalite, a mineral used in the production of fertilizer, in 2021. The section to be built by STRABAG is part of a 37 km tunnel with a diameter of 4.7 m for an environmentally friendly conveyor system to transport the mined polyhalite to Wilton for processing. The STRABAG contract also includes the construction of a tunnel ramp as well as the tunnel portal at Wilton. The actual tunnelling works will cover the distance from the Wilton portal to a shaft at Lockwood Beck, with 150 m to be built via cut-and-cover construction, 800 m through conventional tunnelling and 11,900 m using a tunnel boring machine. Site mobilisation is to begin immediately.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data