74MW Sishen Solar PV project reached financial closure in June 2013, as Windfall 59 Properties, a project company for the project signed a loan facility with Nedbank and Investec to finance the project. The facility would be constructed on a 620 hectare site 17km northwest of the town of Kathu, an area known as one of the best irradiation sites globally, and would use 319,600 crystalline solar pan

Status
Prospective
Sector
Solar, Power Generation (CCGT), Government, Commercial
Location
South Africa
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Sishen Solar PV

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sishen Solar PV” is an infrastructure initiative in the Solar sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

74MW Sishen Solar PV project reached financial closure in June 2013, as Windfall 59 Properties, a project company for the project signed a loan facility with Nedbank and Investec to finance the project. The facility would be constructed on a 620 hectare site 17km northwest of the town of Kathu, an area known as one of the best irradiation sites globally, and would use 319,600 crystalline solar panels. Sponsors of the project were Acciona Energy SA (51%), Aveng Limited (29%), Soul City Institute (10%) and Dibeng Trust (Local Community Fund) (10%). EPC contractors were Acciona(50%)/Aveng (50%) and legal advisers were Webber Wentzel for the borrower and Bowman for the lenders. HSBC was financial advisor to the project. Electricity produced from this Solar PV power plant would be connected and sold to Eskom under a PPA for 20 years. Expected operation date would be December 2014. Estimated total cost of the project is US$238.8 million. As for the financing details, Investec and Nedbank Capital acted as joint mandated lead arrangers for US$179 million of senior debt, with primary shareholders being Acciona Energy South Africa (51%) and Aveng Africa (29%). The MLAs arranged and underwrote US$89.5 million each and both banks wrote interest rate swaps on their debt. Sponsors to be added Aveng Limited (South Africa) http://www.aveng.co.za/ Soul City Institute (South Africa, non-profit) http://www.soulcity.org.za/

Original sector

Energy

Budget

Location

Country

South Africa

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project