logo
ProjectClosed

SISTAN FLOOD CTRL

Sector: Water Supply and Storage • Location: Iran, Islamic Republic of

Source: World Bank Group

The key objectives of the project are to : a) reduce the risks to human life and prevent damage to public and private property and infrastructure due to major floods; b) minimize disruptions to the local economy; c) provide protection against major floods for habitats and cultural property; and d) mitigate environmental degradation and health hazards caused by floods. The project consists of: 1)

Status
Closed
Sector
Water Supply and Storage, Bridge, Automotive, Waste Processing and Treatment, Raw Materials, Government
Location
Iran
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SISTAN FLOOD CTRL

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SISTAN FLOOD CTRL” is an infrastructure initiative in the Water Supply and Storage sector, located in Iran, Islamic Republic of. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The key objectives of the project are to : a) reduce the risks to human life and prevent damage to public and private property and infrastructure due to major floods; b) minimize disruptions to the local economy; c) provide protection against major floods for habitats and cultural property; and d) mitigate environmental degradation and health hazards caused by floods. The project consists of: 1) rehabilitating and upgrading 100 km of dikes along the eastern shore of Hirmand Lake; 2) rehabilitating and upgrading 130 km of dikes along both sides of the Sistan River, and providing a bridge across the river; 3) upgrading 30 km of dikes along the Niatak floodway, including six bridges and an intake structure; 4) remodelling the feeder canal to three existing storage reservoirs; 5) developing a rock quarry; 6) strengthening project management; 7) undertaking physical and mathematical modelling works for river training; 8) providing maintenance equipment and vehicles; 9) providing a flood warning program; and 10) acquiring land for rehabilitating flood control works.

Original sector

FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Iran

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Automotive, Waste Processing and Treatment, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project