SISTAN FLOOD CTRL
Sector: Water Supply and Storage • Location: Iran, Islamic Republic of
Source: World Bank Group
The key objectives of the project are to : a) reduce the risks to human life and prevent damage to public and private property and infrastructure due to major floods; b) minimize disruptions to the local economy; c) provide protection against major floods for habitats and cultural property; and d) mitigate environmental degradation and health hazards caused by floods. The project consists of: 1)
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Automotive, Waste Processing and Treatment, Raw Materials, Government
- Location
- Iran
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SISTAN FLOOD CTRL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The key objectives of the project are to : a) reduce the risks to human life and prevent damage to public and private property and infrastructure due to major floods; b) minimize disruptions to the local economy; c) provide protection against major floods for habitats and cultural property; and d) mitigate environmental degradation and health hazards caused by floods. The project consists of: 1) rehabilitating and upgrading 100 km of dikes along the eastern shore of Hirmand Lake; 2) rehabilitating and upgrading 130 km of dikes along both sides of the Sistan River, and providing a bridge across the river; 3) upgrading 30 km of dikes along the Niatak floodway, including six bridges and an intake structure; 4) remodelling the feeder canal to three existing storage reservoirs; 5) developing a rock quarry; 6) strengthening project management; 7) undertaking physical and mathematical modelling works for river training; 8) providing maintenance equipment and vehicles; 9) providing a flood warning program; and 10) acquiring land for rehabilitating flood control works. |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Iran |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Automotive, Waste Processing and Treatment, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
