Sistema de Esgotamento Sanitário (SES) Project
Sector: Government • Location: Paramirim, Bahia, Brazil
Source: Evrim Ağacı
The SES project in Paramirim has been redeveloped to improve sanitation, benefiting 20,000 residents through the construction of sewer pipes and lift stations, with a total investment of R$ 26.5 million.
- Status
- Closed
- Sector
- Government, Waste Processing and Treatment, Water Supply and Storage
- Location
- Paramirim, Bahia, Brazil
- Updated
- 22 Jul 2026
- Source
- Evrim Ağacı
ConstructChat
Ask ConstructChat about Sistema de Esgotamento Sanitário (SES) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The SES project in Paramirim has been redeveloped to improve sanitation, benefiting 20,000 residents through the construction of sewer pipes and lift stations, with a total investment of R$ 26.5 million. |
Original sector | Sanitation |
Budget |
Location
Country | Brazil |
State | Bahia |
City | Paramirim |
Source
Source | Evrim Ağacı |
URL |
More Details
Record type | Project |
Sector | Government, Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
- ERB Candeias Thermal Power Plant
- Sol do Futuro Solar PV Plant
