logo

Sistema de Esgotamento Sanitário (SES) Project

Sector: Water Supply and Storage • Location: Paramirim, Bahia, Brazil

Source: Evrim Ağacı

Project
Completed

The SES project in Paramirim has been redeveloped to improve sanitation, benefiting 20,000 residents through the construction of sewer pipes and lift stations, with a total investment of R$ 26.5 million.

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government
Location
Paramirim, Bahia, Brazil
Updated
22 Jul 2026
Source
Evrim Ağacı

ConstructChat

Ask ConstructChat about Sistema de Esgotamento Sanitário (SES) Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sistema de Esgotamento Sanitário (SES) Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Paramirim, Bahia, Brazil. Taiyo aggregates data on it from Evrim Ağacı.

Participants

Sponsoring Agency

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The SES project in Paramirim has been redeveloped to improve sanitation, benefiting 20,000 residents through the construction of sewer pipes and lift stations, with a total investment of R$ 26.5 million.

Original sector

Sanitation

Budget

Location

Country

Brazil

State

Bahia

City

Paramirim

Source

Source

Evrim Ağacı

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government

Article published date

2025-02-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project