SITE 276 Border ST
Open · Massachusetts
Source: City of Boston
LIGHTSHIP ENGINEERING WILL ADVANCE BETWEEN 6 AND 8 SOIL BORINGS TO APPROXIMATELY 15 FEET BELOW GRADE USING HOLLOW STEM AUGER DRILLING METHODOLOGY. THREE BORINGS WILL BE COMPLETED AS TEMPORARY GROUNDWATER MONITORING WELLS. SOIL SAMPLES WILL BE TAKEN EVERY 2 FEET FROM 0 TO 15 FEET BELOW GRADE.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- East Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about SITE 276 Border ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | LIGHTSHIP ENGINEERING WILL ADVANCE BETWEEN 6 AND 8 SOIL BORINGS TO APPROXIMATELY 15 FEET BELOW GRADE USING HOLLOW STEM AUGER DRILLING METHODOLOGY. THREE BORINGS WILL BE COMPLETED AS TEMPORARY GROUNDWATER MONITORING WELLS. SOIL SAMPLES WILL BE TAKEN EVERY 2 FEET FROM 0 TO 15 FEET BELOW GRADE. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | East Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
