SITE 301-315 Massachusetts AV
Sector: Bridge • Location: Boston, Massachusetts, United States of America
Source: City of Boston
Nobis Engineering has been retained from Vanasse Hangen Brustlin, Inc. (VHB) to perform two test pits to obtain soil samples of fill material for analytical testing and to verify the type and material of construction of gas and possibly electric utilities located between the stringers of the Massachusetts Avenue Bridge over Huntington Avenue in Boston, Massachusetts for MassDOT Project No. 604871
- Status
- Prospective
- Sector
- Bridge, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about SITE 301-315 Massachusetts AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Nobis Engineering has been retained from Vanasse Hangen Brustlin, Inc. (VHB) to perform two test pits to obtain soil samples of fill material for analytical testing and to verify the type and material of construction of gas and possibly electric utilities located between the stringers of the Massachusetts Avenue Bridge over Huntington Avenue in Boston, Massachusetts for MassDOT Project No. 604871 & Bridge No. B-16-238 (38P). |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Bridge, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
