logo
ProjectOpenBP

SITE 338 E Eagle ST

Open · Massachusetts

Source: City of Boston

Weston & Sampson Engineers, Inc. (Weston & Sampson) has been retained by Leers Weinzapfel Associates Architects to complete a geotechnical evaluation for the proposed East Boston Police Station at 338 East Eagle Street and 0 (Zero) Condor Street in Boston, Massachusetts. Our evaluation will include nine (9) test borings to investigate subsurface conditions at the site. The test borings will be obs

Status
Prospective
Sector
Road, Cement, Commercial, Government
Location
East Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about SITE 338 E Eagle ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SITE 338 E Eagle ST” is an infrastructure initiative in the Road sector, located in East Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Weston & Sampson Engineers, Inc. (Weston & Sampson) has been retained by Leers Weinzapfel Associates Architects to complete a geotechnical evaluation for the proposed East Boston Police Station at 338 East Eagle Street and 0 (Zero) Condor Street in Boston, Massachusetts. Our evaluation will include nine (9) test borings to investigate subsurface conditions at the site. The test borings will be observed by a Weston & Sampson representative and completed by New England Boring Contractors of Brockton, Massachusetts. The test borings will be advanced with a truck-mounted drill rig using hollow-stem auger and drive-and-wash drilling methods to depths up to 50 feet. Standard Penetration Tests will be conducted in the borings at approximate 5-ft. intervals to obtain geotechnical samples and evaluate in-situ soil consistencies. Upon completion, the boreholes will be backfilled with the cuttings removed during drilling and patched to match surrounding surfaces (e.g. concrete or asphalt). No groundwater monitoring wells will be installed.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

East Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Road, Cement, Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project