SITE 45 Dewar ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Vacuum-excavation of all boring location to 5 ft. Advancement of 5 borings to 50 ft below ground surface using drive and wash methods and standard sampling. Backfilling completed borings with sand and soil cuttings to ground surface, then patching at grade as necessary.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about SITE 45 Dewar ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Vacuum-excavation of all boring location to 5 ft. Advancement of 5 borings to 50 ft below ground surface using drive and wash methods and standard sampling. Backfilling completed borings with sand and soil cuttings to ground surface, then patching at grade as necessary. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
