SITE 6 Croydon ST
Open · Massachusetts
Source: City of Boston
Excavation and repair of roof leader to existing drywell. Connection of drainage sump to roof leader. No domestic waste water or potable water discharge to sump. Sump drains only water infiltrating into basement. All work being conducted as required by MassDEP to address potential contamination from abutter.
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Government, Waste Processing and Treatment
- Location
- Mattapan, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about SITE 6 Croydon ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Excavation and repair of roof leader to existing drywell. Connection of drainage sump to roof leader. No domestic waste water or potable water discharge to sump. Sump drains only water infiltrating into basement. All work being conducted as required by MassDEP to address potential contamination from abutter. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Mattapan |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Waste Processing and Treatment |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
