SITE 7 Braintree ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Performing 2 geotechnical soil borings with SPT samples using rotary wash drilling methods to depths of approximately 60 feet, including up to 10 feet of rock coring. Each boring will be backfilled with soil cuttings and clean sand upon completion. If the borings are located in paved areas they will be completed at the surface with asphalt cold path, or if they are located in sidewalks they will
- Status
- Prospective
- Sector
- Road, Cement, Commercial, Government
- Location
- Brighton, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about SITE 7 Braintree ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Performing 2 geotechnical soil borings with SPT samples using rotary wash drilling methods to depths of approximately 60 feet, including up to 10 feet of rock coring. Each boring will be backfilled with soil cuttings and clean sand upon completion. If the borings are located in paved areas they will be completed at the surface with asphalt cold path, or if they are located in sidewalks they will be completed at the surface with concrete. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brighton |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
