logo

Site C Water Well Replacement

Sector: Water Supply and Storage • Location: Burnaby, British Columbia, Canada

Source: Dodge USA

Project
Bid Results

This RFP is issued by BC Hydro to obtain Proposals from parties wishing to provide the following Work to BC Hydro: Provide new and replacement water wells on Crown Land and private property in multiple locations within the Peace Region, generally between Hudson's Hope and the Site C dam. Contractor will be responsible for drilling, installing, pumping and testing wells. The Work MUST be conducted

Status
Closed
Sector
Water Supply and Storage, Hydro, Commercial, Waste Processing and Treatment
Location
Burnaby, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Site C Water Well Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Site C Water Well Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Burnaby, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This RFP is issued by BC Hydro to obtain Proposals from parties wishing to provide the following Work to BC Hydro: Provide new and replacement water wells on Crown Land and private property in multiple locations within the Peace Region, generally between Hudson's Hope and the Site C dam. Contractor will be responsible for drilling, installing, pumping and testing wells. The Work MUST be conducted by certified well driller AND certified well pump installer per the Water Sustainability Act (WSA...

Procurement method

Location

Country

Canada

State

British Columbia

City

Burnaby

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Commercial, Waste Processing and Treatment

Article published date

2024-02-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project