Site Development
Sector: Manufacturing (Industrial) • Location: Far Rockaway, New York, United States of America
Source: Dodge USA
Site work including tree protection and new property line box, utility trench and new asphalt block pavers for restoration areas for work in conjunction with TEMPORARILY RELOCATE FERRY EMBARKATION AND SECURITY SCREENING OPERATIONS IN BATTERY PARK.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Energy Storage, Commercial, Car parking, Power Transmission, Road, Government, Automotive, Power Generation (CCGT)
- Location
- Far Rockaway, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Site Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Site work including tree protection and new property line box, utility trench and new asphalt block pavers for restoration areas for work in conjunction with TEMPORARILY RELOCATE FERRY EMBARKATION AND SECURITY SCREENING OPERATIONS IN BATTERY PARK. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Far Rockaway |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Energy Storage, Commercial, Car parking, Power Transmission, Road, Government, Automotive, Power Generation (CCGT) |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
