Site Maintenance & Minor Construction
One of 10,000+ projects Taiyo tracks in Arizona.
Source: Dodge USA
This project consists of construction activities associated with seeding and erosion control efforts to ensure the stability and longevity of environmental remediation activities performed in 2022 and 2023 at these sites. Activities onsite will include soil decompaction, hydromulching, hand seeding, mulching, the removal and disposal of existing erosion control materials, and road maintenance as n
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Commercial
- Location
- Phoenix, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Site Maintenance & Minor Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of construction activities associated with seeding and erosion control efforts to ensure the stability and longevity of environmental remediation activities performed in 2022 and 2023 at these sites. Activities onsite will include soil decompaction, hydromulching, hand seeding, mulching, the removal and disposal of existing erosion control materials, and road maintenance as needed. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Phoenix |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Commercial |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
