logo

Six Nations Master Drainage and Flood Remediation Plan (MDFRP)

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
In Progress

River and water system protection by First Nations address not only traditional value concerns about the environment, but also the local impacts of flooding. In some cases, changes to the river system upstream and downstream of Reserve Lands (without First Nation engagement) are the main reasons for these problems on the Reserve. Six Nations of the Grand River has therefore partnered with Stragis

Status
Under Construction
Sector
Water Supply and Storage, Waste Processing and Treatment, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Six Nations Master Drainage and Flood Remediation Plan (MDFRP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Six Nations Master Drainage and Flood Remediation Plan (MDFRP)” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

River and water system protection by First Nations address not only traditional value concerns about the environment, but also the local impacts of flooding. In some cases, changes to the river system upstream and downstream of Reserve Lands (without First Nation engagement) are the main reasons for these problems on the Reserve. Six Nations of the Grand River has therefore partnered with Stragis Environmental Services Inc./the Greenland Group to prepare a Master Drainage and Flood Remediation Plan (MDFRP). This project will help find methods of reducing or eliminating current flooding problems within the Six Nations of the Grand River Territory. Protection measures will also be found for areas where flood level reductions are not feasible in project future development areas. The work officially began on March 23, 2015 with completion scheduled for December 2015. The proposed work program is tailored to an “environmental protection approach”. This process ensures that Six Nations traditional, social, economic and natural environment factors are considered in the planning and design of new infrastructure (including flood control) or improving existing facilities. Deliverables for this project include: • Flood Impact Strategy - describe what areas are most likely to flood and decide which culverts and streams need to be improved to reduce flooding. • Training and hiring of local Six Nation community members to assist with collecting drainage information. • Development of a Business Case to generate funding for improvements that needs to be made to the drainage system and reduce or eliminate flooding. On completion of the planning tasks and the identification of the recommended preferred Floodplain Management Plan for Six Nations the specific priority projects from the Plan will be designed and implemented including construction and associated monitoring.

Original sector

Climate Resilience

Budget

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project