Six Nations of the Grand River Wastewater Lagoons Forcemain Upgrade Construction
Sector: Waste Processing and Treatment • Location: Ontario, Canada
Source: Infrastructure Canada
The project will replace a pressurized sewage pipe in the Six Nations of the Grand River First Nation in Ontario. The work will involve the installation of a larger, 932-metre pipe through horizontal drilling that will connect the lift station to a three-cell lagoon. The project will increase the rate of sewage treatment, which will support better health and safety and environmental protection by
- Status
- Under Construction
- Sector
- Waste Processing and Treatment, Water Supply and Storage
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Six Nations of the Grand River Wastewater Lagoons Forcemain Upgrade Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will replace a pressurized sewage pipe in the Six Nations of the Grand River First Nation in Ontario. The work will involve the installation of a larger, 932-metre pipe through horizontal drilling that will connect the lift station to a three-cell lagoon. The project will increase the rate of sewage treatment, which will support better health and safety and environmental protection by reducing the need for frequent discharges of partially treated sewage effluent into McKenzie Creek. The new pipe will also decrease reliance on two older cell lagoons that will now be dedicated for emergency use only. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2026-06-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
