Sixth Street Expansion and Improvements
Sector: Transportation • Location: Springfield, Illinois, United States
Source: Prezly.com
Expansion of Sixth Street from I-72 to north of Stevenson Drive to three lanes, traffic signal replacement, pedestrian and bicycle improvements. Project anticipated to begin fall 2026 and complete fall 2028. Two lanes open in each direction during peak hours, short-term closures of I-72 ramps and Sixth Street Frontage Road and St. Joseph Street.
- Status
- Prospective
- Sector
- Transportation
- Location
- Springfield, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Prezly.com
ConstructChat
Ask ConstructChat about Sixth Street Expansion and Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Expansion of Sixth Street from I-72 to north of Stevenson Drive to three lanes, traffic signal replacement, pedestrian and bicycle improvements. Project anticipated to begin fall 2026 and complete fall 2028. Two lanes open in each direction during peak hours, short-term closures of I-72 ramps and Sixth Street Frontage Road and St. Joseph Street. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Illinois |
City | Springfield |
Source
Source | Prezly.com |
URL |
More Details
Record type | Project |
Article published date | 2026-07-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
