Siziwang Qi Wind Farm Project
Sector: Wind • Location: China
Source: World Bank Group
In April 2008, HKC (Holdings) Limited, a Hong Kong based company focusing on wind plant project development in Mainland China obtained final approval from the Development and Reform Commission of Siziwang Qi to develop a wind power plant in Siziwang Qi, Inner Mongolia. The project was procured through direct negotiation.
For the purpose of constructing the wind farm, the sponsor entered in Jun
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In April 2008, HKC (Holdings) Limited, a Hong Kong based company focusing on wind plant project development in Mainland China obtained final approval from the Development and Reform Commission of Siziwang Qi to develop a wind power plant in Siziwang Qi, Inner Mongolia. The project was procured through direct negotiation. For the purpose of constructing the wind farm, the sponsor entered in June 2008 into 2 contracts of purchasing 33 sets of wind turbine and turbine tower with an aggregate value of approximately RMB349.8 million (approximately HK$393.2 million). The sponsor expected further contracts would be entered for acquisition of other wind power generation equipments for the project. The project has a capacity of 49.5 MW and the total investment is RMB 480 million (US$ 68.67 million). HKC (Holdings) Limited owned 100% of the project and would operate it for 20 years. The project was expected to be operational in September 2009. According to the latest information (http://www.china5e.com/newenergy/newenergynews.aspx?newsid=7396946c-ff16-43d7-8c73-fabe25580b79&panelv=%u6700%u65b0%u8d44%u8baf&classv=%u98ce%u80fd&classid=%u65b0%u80fd%u6e90&pageid=5), the project is progressing well. However the exact financial closing time cannot be identified. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
