logo

Siziwang Qi Wind Farm Project

Sector: Wind • Location: Inner Mongolia, China

Source: World Bank Group

Project
Active

In April 2008, HKC (Holdings) Limited, a Hong Kong based company focusing on wind plant project development in Mainland China obtained final approval from the Development and Reform Commission of Siziwang Qi to develop a wind power plant in Siziwang Qi, Inner Mongolia. The project was procured through direct negotiation.

For the purpose of constructing the wind farm, the sponsor entered in Jun

Status
Prospective
Sector
Wind, Power Generation (CCGT), Raw Materials, Commercial, Government
Location
Inner Mongolia, China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Siziwang Qi Wind Farm Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Siziwang Qi Wind Farm Project” is an infrastructure initiative in the Wind sector, located in Inner Mongolia, China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In April 2008, HKC (Holdings) Limited, a Hong Kong based company focusing on wind plant project development in Mainland China obtained final approval from the Development and Reform Commission of Siziwang Qi to develop a wind power plant in Siziwang Qi, Inner Mongolia. The project was procured through direct negotiation. For the purpose of constructing the wind farm, the sponsor entered in June 2008 into 2 contracts of purchasing 33 sets of wind turbine and turbine tower with an aggregate value of approximately RMB349.8 million (approximately HK$393.2 million). The sponsor expected further contracts would be entered for acquisition of other wind power generation equipments for the project. The project has a capacity of 49.5 MW and the total investment is RMB 480 million (US$ 68.67 million). HKC (Holdings) Limited owned 100% of the project and would operate it for 20 years. The project was expected to be operational in September 2009. According to the latest information (http://www.china5e.com/newenergy/newenergynews.aspx?newsid=7396946c-ff16-43d7-8c73-fabe25580b79&panelv=%u6700%u65b0%u8d44%u8baf&classv=%u98ce%u80fd&classid=%u65b0%u80fd%u6e90&pageid=5), the project is progressing well. However the exact financial closing time cannot be identified.

Original sector

Energy

Budget

Location

Country

China

State

Inner Mongolia

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT), Raw Materials, Commercial, Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project