SJCCD - Parking Lots A to B Site Improvements
Sector: Cement • Location: Rocklin, California, United States of America
Source: Dodge
The Project consists of the demolition of existing trees, planters, utilities, asphalt and concrete. Installation of new asphalt paving, concrete paving accessible walks, ramps and vehicle drop off areas. Installation of new pedestrian path lighting and landscaping
- Status
- Closed
- Sector
- Cement, Automotive, Power Transmission, Car parking, Commercial, Power Generation (CCGT), Road
- Location
- Rocklin, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about SJCCD - Parking Lots A to B Site Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of the demolition of existing trees, planters, utilities, asphalt and concrete. Installation of new asphalt paving, concrete paving accessible walks, ramps and vehicle drop off areas. Installation of new pedestrian path lighting and landscaping |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Rocklin |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Automotive, Power Transmission, Car parking, Commercial, Power Generation (CCGT), Road |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
