SJEC WTP Phase 3 Expansion
Sector: Water Supply and Storage • Location: South Bend, Indiana, United States of America
Source: Dodge USA
The project includes the expansion and conversion of the existing St. Joseph Energy Center Water Treatment Plant (SJEC WTP) near New Carlisle, IN. The SJEC Phase 3 Expansion and Potable Water Treatment Conversion - Increasing the SJEC WTP filtration capacity by 6 MGD to a capacity of 18 MGD. The following is a general summary of the work associated with this project: a. Three pressure filters, eac
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Government, Waste Processing and Treatment, Commercial
- Location
- South Bend, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about SJEC WTP Phase 3 Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the expansion and conversion of the existing St. Joseph Energy Center Water Treatment Plant (SJEC WTP) near New Carlisle, IN. The SJEC Phase 3 Expansion and Potable Water Treatment Conversion - Increasing the SJEC WTP filtration capacity by 6 MGD to a capacity of 18 MGD. The following is a general summary of the work associated with this project: a. Three pressure filters, each containing two filter cells, associated process water piping, controls, power wiring and contro... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | South Bend |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Government, Waste Processing and Treatment, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
