SJVN Integrated Solar & BESS Project
Sector: Power Generation (CCGT) • Location: India
Source: Business Standard
Reliance NU Energies has secured a significant allocation in SJVN's competitive bidding process, winning 350 MW of solar generation capacity along with a 175 MW/700 MWh battery energy storage system. This project aims to enhance Reliance Power's clean energy portfolio and is part of a larger initiative to develop integrated solar and battery energy storage solutions in India.
- Status
- Closed
- Sector
- Power Generation (CCGT), Energy Storage, Solar
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Business Standard
ConstructChat
Ask ConstructChat about SJVN Integrated Solar & BESS Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Reliance NU Energies has secured a significant allocation in SJVN's competitive bidding process, winning 350 MW of solar generation capacity along with a 175 MW/700 MWh battery energy storage system. This project aims to enhance Reliance Power's clean energy portfolio and is part of a larger initiative to develop integrated solar and battery energy storage solutions in India. |
Original sector | Energy |
Location
Country | India |
Source
Source | Business Standard |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Energy Storage, Solar |
Article published date | 2025-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
