Skinners Pond Route 14 Structure

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

The replacement of a highway structure on Route 14 in Skinners Pond. The scope includes: - Installation of environmental controls (silt fences, straw mulch, silt booms, check dams, and others as required) - Clearing and grubbing of vegetation locally within the project site - Excavation of earthen material to gain access to the structure for removal - Removal and disposal of the existing structure

Status
Closed
Sector
Road, Government
Location
Prince Edward Island, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Skinners Pond Route 14 Structure

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Skinners Pond Route 14 Structure” is an infrastructure initiative in the Road sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The replacement of a highway structure on Route 14 in Skinners Pond. The scope includes: - Installation of environmental controls (silt fences, straw mulch, silt booms, check dams, and others as required) - Clearing and grubbing of vegetation locally within the project site - Excavation of earthen material to gain access to the structure for removal - Removal and disposal of the existing structure - Provision of temporary stream alignment in order to install new structure(s) in the dry - Install new HDPE pipe structure - Supply, placement and compaction of suitable backfill material - Install new guardrail - Supply, placement and compaction of roadway base gravels and asphalt base and wearing surface - Supply and placement of topsoil and hydroseed - Site clean-up and demobilize. Schedule would be from Sept. 2022 to November 2022.

Original sector

Roads, Bridges and Trade Infrastructure

Location

Country

Canada

State

Prince Edward Island

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Road, Government

Article published date

2026-02-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project