Skuodas RES Cluster
In exploratory, pending final review · Lithuania
Source: European Bank for Reconstruction and Development (EBRD)
The operation involves the development, construction, and operation of a hybrid renewables cluster consisting of 156 MW wind, 122 MW photovoltaic (PV) solar and 100 MW / 200 MWh battery energy storage system (BESS) in Klaipeda, Lithuania (the Project).
- Status
- Prospective
- Sector
- Solar, Raw Materials, Commercial, Energy Storage, Power Generation (CCGT), Wind, Residential, Oil and Gas
- Location
- Lithuania
- Updated
- 19 Nov 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Skuodas RES Cluster
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in exploratory, pending final review |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The operation involves the development, construction, and operation of a hybrid renewables cluster consisting of 156 MW wind, 122 MW photovoltaic (PV) solar and 100 MW / 200 MWh battery energy storage system (BESS) in Klaipeda, Lithuania (the Project). |
Original sector | Energy |
Location
Country | Lithuania |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Solar, Raw Materials, Commercial, Energy Storage, Power Generation (CCGT), Wind, Residential, Oil and Gas |
Article published date | 2026-09-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
