Sky House / COA Arquitectura
The status, timeline and source of this project. A free account opens every field.
Source: ArchDaily
Crossing the door’s threshold, a vestibule faces the staircase that leads to the basement and upper floor, three steps beyond, the living room and dining area is opened to the right with a straight clear view to the forest. The master bedroom and bathroom share the same view, the same ‘bring the forest inside’.Text description provided by the architects.The house is located in a subdivision inside
- Status
- Closed
- Sector
- Steel, Metal, Water Supply and Storage, Road, Commercial, Residential
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Sky House / COA Arquitectura
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Crossing the door’s threshold, a vestibule faces the staircase that leads to the basement and upper floor, three steps beyond, the living room and dining area is opened to the right with a straight clear view to the forest. The master bedroom and bathroom share the same view, the same ‘bring the forest inside’.Text description provided by the architects.The house is located in a subdivision inside a natural forested area. The property has neighbors on each side barely three meters apart, while the rear side is next to an oak tree reservation where the view is narrowed only a few meters away because of the trunks and canopies’ density.The house occupies all the lot and adopts its triangular shape. It is proposed as a carved volume to give place to the openings and transition courtyards between the interior and exterior. It is built of only one material, looking for a calm integration with the landscape.The house is both a transitional space between the street-city and the forest, and a place-refuge from both.Two more bedrooms that inhabit the upper floor of the main façade are opened laterally to the exterior through semi-closed courtyards so that the volume is as least perforated as possible.Hence the emphasis on the entry experience, to leave behind so that the foyer and the murmur of water welcome us. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Steel, Metal, Water Supply and Storage, Road, Commercial, Residential |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Safeway Refrigerated Warehouse
- Fire Lake Mining
- Kearl Ore Preparation Plant
