Skye Reinforcement Project
Sector: Hydro • Location: United Kingdom
The proposed Skye Reinforcement Project involves (1) the construction and operation of approximately 110 km of double circuit steel structure 132 kV overhead line between Fort Augustus and Edinbane Substation, (2) approximately 27 km of new single circuit trident H wood pole overhead line between Edinbane Substation and Ardmore Substation and (3) 750 m temporary diversion of the existing 132 kV ov
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Steel, Government, Road
- Location
- United Kingdom
- Updated
- 19 Nov 2026
- Source
- Scottish Government Energy Consents Unit
ConstructChat
Ask ConstructChat about Skye Reinforcement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | consented |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed Skye Reinforcement Project involves (1) the construction and operation of approximately 110 km of double circuit steel structure 132 kV overhead line between Fort Augustus and Edinbane Substation, (2) approximately 27 km of new single circuit trident H wood pole overhead line between Edinbane Substation and Ardmore Substation and (3) 750 m temporary diversion of the existing 132 kV overhead line at Inchlaggan to facilitate construction of the new overhead line, in the Highlands, together referred to as the Proposed Development. The total length of the new transmission connection would be approximately 160 km in length (which includes approximately 24km of underground cable). Following completion of the Skye Reinforcement Project, the existing 132 kV OHL would be dismantled and removed. |
Original sector | Overhead Power Line |
Location
Country | United Kingdom (UK) |
Source
Source | Scottish Government Energy Consents Unit |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Steel, Government, Road |
Article published date | 2026-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
