Skyline Homes
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
Construction of eight (8) new stick-built homes, four one bedrooms and four two bedrooms. Located at Atsiip Rd Happy Camp, Siskiyou County, California. The Contractor shall furnish all labor, material, equipment, and services required for the construction, inspection, and commissioning of a new sub division. All utilities will be located behind sidewalk (power, sewer, water and communications). Ba
- Status
- Closed
- Sector
- Car parking, Water Supply and Storage, Residential, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Happy Camp, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Skyline Homes
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of eight (8) new stick-built homes, four one bedrooms and four two bedrooms. Located at Atsiip Rd Happy Camp, Siskiyou County, California. The Contractor shall furnish all labor, material, equipment, and services required for the construction, inspection, and commissioning of a new sub division. All utilities will be located behind sidewalk (power, sewer, water and communications). Base rock pads will need to be constructed to finished elevation and covered with mold resistant mo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Happy Camp |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Water Supply and Storage, Residential, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
