logo

SkyTrain Running Rail Replacement Project

Sector: Mass Transit • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
In Progress

TransLink’s Expo and Millennium SkyTrain Lines contain approximately 117 track km (234 linear km of running rail). As a core component of SkyTrain infrastructure, running rails require ongoing maintenance and renewals. This project will include the replacement of TransLink’s running rail to maintain a state of good repair. On average, non-revenue and revenue vehicles travel around 53 million kms

Project Information FAQ

Project Information

4 Q
The project “SkyTrain Running Rail Replacement Project” is an infrastructure initiative in the Mass Transit sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

TransLink’s Expo and Millennium SkyTrain Lines contain approximately 117 track km (234 linear km of running rail). As a core component of SkyTrain infrastructure, running rails require ongoing maintenance and renewals. This project will include the replacement of TransLink’s running rail to maintain a state of good repair. On average, non-revenue and revenue vehicles travel around 53 million kms on these lines each year (2018). This continued use results in wear, defect formation, and the general deterioration of track components, including the running rail. The impact of this wear impacts the reliability and safety of operations, as well as the noise levels in commercial and residential spaces next to the SkyTrain line. In some areas, rail defects have produced observed noise levels exceeding 95 dBA (e.g., equivalent to a motorcycle engine) in neighbouring homes. In 2021, 60% of the running rail is considered very good condition with less than 3 mm of vertical wear (>14 mm would require immediate replacement). Between 2022 and 2026, approximately 10.1 track km (20.2 km of running rail) and approximately 24,000 rail pads will require replacement due to the level of wear, and due to additional deformities that have been identified. The purpose of this project is to proactively replace the identified running rail and rail pads over a multi-year period, in order to maintain a state of good repair, address environmental/noise impacts, and enable the continued, uninterrupted operation of the Expo and Millennium Lines. The scope of the replacement would occur between September 2022 and March 2027, with a portion of running rail being replaced each year to maximize the life of the current asset, and to avoid disruption to SkyTrain services. Because this project is focused solely on the replacement of existing running rail, it is considered a rehabilitation project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data