SkyTrain Traction Power Replacement
Sector: Mass Transit • Location: British Columbia, Canada
Source: Infrastructure Canada
TransLink’s Expo and Millennium SkyTrain Lines are approximately 60 kilometres in length with more than 35 stations spread across multiple municipalities in Metro Vancouver. The Expo and Millennium lines are powered by a traction power network that includes substations, electrical cabling, and power rails. TransLink has reviewed the current state of the existing traction power network. While the m
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in progress |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | TransLink’s Expo and Millennium SkyTrain Lines are approximately 60 kilometres in length with more than 35 stations spread across multiple municipalities in Metro Vancouver. The Expo and Millennium lines are powered by a traction power network that includes substations, electrical cabling, and power rails. TransLink has reviewed the current state of the existing traction power network. While the majority of the network is in good condition, TransLink has identified components that would need to be replaced in order to ensure a state of good repair and address electrical safety issues for 11 substations along the Expo line. This ICIP application includes scope for four of the 11 substations (phase 2 of the planned project), including the replacement of: Expo Line guideway power cables in poor condition, as assessed by an Expo Guideway Line condition assessment; and AC and DC switchgear. Installation of Pad Mounted Transformer at the sites where space within the PPS is an issue (Columbia, New Westminster, Main, Waterfront, Broadway, Nanaimo, and Joyce). As a result, TransLink has initiated a Traction Power System Replacement project to proactively replace the identified traction power equipment over a course of multiple years in order to maintain a state of good repair, and enable the continued, uninterrupted operation of the Expo and Millennium Lines. The complete scope of the proposed traction power updates is essential to maintain and safely operate SkyTrain. Without it, TransLink could not safely operate the Expo and Millennium Lines at current levels, or support future service increases or expanded fleet as proposed by the Metro Vancouver Mayors’ Vision. The scope of the replacement would occur between April 2023 and December 2026. Since this project is focused solely on the replacement of existing traction power equipment, it is considered a rehabilitation project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
