logo

SkyTrain Traction Power Replacement

Sector: Power Generation (CCGT) • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
In Progress

TransLink’s Expo and Millennium SkyTrain Lines are approximately 60 kilometres in length with more than 35 stations spread across multiple municipalities in Metro Vancouver. The Expo and Millennium lines are powered by a traction power network that includes substations, electrical cabling, and power rails. TransLink has reviewed the current state of the existing traction power network. While the m

Status
Under Construction
Sector
Power Generation (CCGT), Mass Transit, Telecommunications
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about SkyTrain Traction Power Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “SkyTrain Traction Power Replacement” is an infrastructure initiative in the Power Generation (CCGT) sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

TransLink’s Expo and Millennium SkyTrain Lines are approximately 60 kilometres in length with more than 35 stations spread across multiple municipalities in Metro Vancouver. The Expo and Millennium lines are powered by a traction power network that includes substations, electrical cabling, and power rails. TransLink has reviewed the current state of the existing traction power network. While the majority of the network is in good condition, TransLink has identified components that would need to be replaced in order to ensure a state of good repair and address electrical safety issues for 11 substations along the Expo line. This ICIP application includes scope for four of the 11 substations (phase 2 of the planned project), including the replacement of: •Expo Line guideway power cables in poor condition, as assessed by an Expo Guideway Line condition assessment; and • AC and DC switchgear. • Installation of Pad Mounted Transformer at the sites where space within the PPS is an issue (Columbia, New Westminster, Main, Waterfront, Broadway, Nanaimo, and Joyce). As a result, TransLink has initiated a Traction Power System Replacement project to proactively replace the identified traction power equipment over a course of multiple years in order to maintain a state of good repair, and enable the continued, uninterrupted operation of the Expo and Millennium Lines. The complete scope of the proposed traction power updates is essential to maintain and safely operate SkyTrain. Without it, TransLink could not safely operate the Expo and Millennium Lines at current levels, or support future service increases or expanded fleet as proposed by the Metro Vancouver Mayors’ Vision. The scope of the replacement would occur between April 2023 and December 2026. Since this project is focused solely on the replacement of existing traction power equipment, it is considered a rehabilitation project.

Original sector

Public Transit

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Mass Transit, Telecommunications

Article published date

2026-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project