Skyway Arena Replacement
Start · Ontario · Last reported Oct 2022
Source: Dodge USA
Funding identified in 2020 is for the construction of the new Skyway Arena facility. This will replace the existing facility that houses a Freon based refrigeration system that must be phased out by 2020 per the Canadian Environment Protection Act, along with the remainder of the facility systems that have reached their end of life.
- Status
- Under Construction
- Sector
- Stadium, Government, Commercial, Manufacturing (Industrial)
- Location
- Burlington, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Skyway Arena Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Funding identified in 2020 is for the construction of the new Skyway Arena facility. This will replace the existing facility that houses a Freon based refrigeration system that must be phased out by 2020 per the Canadian Environment Protection Act, along with the remainder of the facility systems that have reached their end of life. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Burlington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Stadium, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
