SL 323 ONE COURSE SURFACE TREATMENT & PV MK from SH 64 IN TYLER, S & SW to 0.6 MI E OF US 69 (COPELAND RD)
Sector: Solar • Location: Texas, United States of America
Source: Texas Department of Transportation (TXDOT)
Project
Closed
- Status
- Closed
- Sector
- Solar, Government
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Texas Department of Transportation (TXDOT)
ConstructChat
Ask ConstructChat about SL 323 ONE COURSE SURFACE TREATMENT & PV MK from SH 64 IN TYLER, S & SW to 0.6 MI E OF US 69 (COPELAND RD)
Pick a question to edit it, or write your own.
First answer free · no account
I am a
Project Information FAQ
Project Information
5 Q
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Budget |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Texas Department of Transportation (TXDOT) |
URL |
More Details
Record type | Project |
Sector | Solar, Government |
Article published date | 2025-06-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in United States of America
- William and Linda Frost Center for Research and Innovation
- INSTALL (27) 360W MODULES AT 9.72 KW TOTAL.
- ROOF MOUNT PV SYSTEM: (16) 335W MODULES AT 5.36 KW TOTAL
- AS PER MASTER PV PERMIT 202103084 SOHAY LINE BUILDING 20 UNIT 240 (7) MODULE 2.45 KW SYSTEM
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.19 KW 9 PANELS
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 5.1 KW 12 MODULES
- 9.8 KW PV (37) MODULE SOLAR ROOFTOP INSTALLATION GARAGE INSTEAD OF THE EXTERIOR
- PV SOLAR ROOF MOUNT INSTALLATION: (11) 400W MODULES AT 4.4 K W TOTAL.
