SL Completion of Bumbuna Hydroelectric project - IDA Guarantee
Sector: Road • Location: Sierra Leone
Source: World Bank
The main development objective from the Completion of the Bumbuna Hydroelectric Project is to accelerate economic growth, and poverty reduction, through the development of least-cost, power generation for domestic use in an environmentally sustainable, and efficient manner. In addition to mobilizing private capital, the proposed Project will promote private sector involvement in the management of
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Tunnel, Metal, Commercial, Raw Materials, Steel, Cement, Government
- Location
- Sierra Leone
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about SL Completion of Bumbuna Hydroelectric project - IDA Guarantee
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main development objective from the Completion of the Bumbuna Hydroelectric Project is to accelerate economic growth, and poverty reduction, through the development of least-cost, power generation for domestic use in an environmentally sustainable, and efficient manner. In addition to mobilizing private capital, the proposed Project will promote private sector involvement in the management of the power sector, and sustainable sector reform. The first component - Hydroelectric and Transmission Infrastructure - entails the construction of a) an asphalt concrete dam with a 440 m crest-length; b) a water intake structure; c) two "morning glory" spillways with associated tunnels; d) an above-ground powerhouse with two 25 MW turbo-generator units; and, e) a 30 km Y-shaped reservoir with 445 million m3 storage capacity. Further construction includes the installation of switchyards to transmit electricity to Freetown, through a single-circuit transmission line on self-supporting steel towers. The second component will fund the implementation of the Dam/Reservoir, and the Transmission Line Resettlement Action Plan, with livelihood restoration and agriculture stabilization subcomponents, in addition to a comprehensive Environmental Management and Mitigation Plan (EMP). The EMP encompasses the construction phase mitigation, and monitoring activities associated with the first component, including the monitoring of public health impacts on diseases such as bilharzia and malaria. It also includes the preparation and initiation of the Bumbuna Watershed Management Plan (BWMP) with a Land and Soil Management, Agro-forestry and Forestry, Agricultural Development and Downstream and Reservoir Fisheries Management Programs. The establishment and management of the Bumbuna Conservation Area (BCA) will preserve and protect biodiversity in the Bumbuna watershed as a Conservation offset. This component also includes the Upper Seli Community Development Initiative (USDCI), which will benefit indirectly affected communities in the project area, and, capacity building for relevant ministries, and agencies for sustainable implementation of the project safeguard measures. Finally, the Technical Assistance component will fund the management and supervision of activities under the second component, and in addition, provide support to the Project Implementation Unit (PIU), the Dam Review Panel (DRP), and the Environmental and Social Advisory Panel (ESAP). |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Sierra Leone |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Tunnel, Metal, Commercial, Raw Materials, Steel, Cement, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Sierra Leone
- Sierra Leone - Matotoka to Sefadu Road Studies and Institutional Support to the Transport Sector
- Sierra Leone - Mano River union rehabilitation of Bo-Bandajuma road project
- Dragon Transport Ltd.
- Sierra Tropical Limited
- Sierra Leone - Social Action Support Project (SASP)
- Sierra Leone - Torma Bum Rice Development Project
- Sierra Leone - Torma Bum Rice Development Project
- Sierra Leone - Torma Bum Rice Development Project
