SL Infrastructure Development Project (Transport)
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Infrastructure Development Project seeks to rehabilitate selected priority roads, port and airport facilities in Sierra Leone, and, to support regulatory and institutional reforms, and the effective management of the country's road, port, and airport sectors. The Road Infrastructure and Management component entail the rehabilitation of two segments of the primary road network, Bo-Kenema, and M
- Status
- Closed
- Sector
- Airport, Road, Aerospace & Defense, Water Supply and Storage, Power Generation (CCGT), Seaport, Commercial, Government, Residential
- Location
- Sierra Leone
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SL Infrastructure Development Project (Transport)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Infrastructure Development Project seeks to rehabilitate selected priority roads, port and airport facilities in Sierra Leone, and, to support regulatory and institutional reforms, and the effective management of the country's road, port, and airport sectors. The Road Infrastructure and Management component entail the rehabilitation of two segments of the primary road network, Bo-Kenema, and Makeni-Matotoka, as well as approximately 400 km around the "access-poor" districts of Kailahun, Kono, and Koinadugu, in addition to other(s) to be acceptable to the Bank for its support to the reform, and restructuring of the road sector. The second component - Freetown Port Infrastructure and Management - will finance the expansion of the paved container, stacking area, in addition to the supply of specialized equipment to meet internationally recognized, environmental and safety standards, to further support the Action Plan implementation for Port privatization. The Freetown International Airport Infrastructure and Management, third component, includes the rehabilitation and strengthening of the runway; upgrading of turning loops, and taxiway entrances, to safely accommodate modern aircraft; and, installation and upgrading of water and electricity supplies for security, sanitation, fire fighting, and back-up supplies, and in addition, supporting the Sierra Leone Airports Authority (SLAA) efforts to increase efficiency, and competitiveness. Finally, the fourth component - Project Coordination - will focus on the coordination and monitoring of the three sector-based components, through the previously established Coordination and Monitoring Unit (CMU), under the Office of the Vice President, and includes financial management, and environmental and social safeguard expertise, plus quality assurance and procurement capacity building, as well as implementation of a Master Plan Study for the International Airport, and other studies still to be identified. |
Original sector | FY17 - Public Administration,FY17 - Transportation |
Budget |
Location
Country | Sierra Leone |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Airport, Road, Aerospace & Defense, Water Supply and Storage, Power Generation (CCGT), Seaport, Commercial, Government, Residential |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Airport projects in Sierra Leone
- Sky Handling Partner Sierra Leone Limited
- Sierra Leone - Freetown Water Supply and Sanitation Master Plan and Investment Studies
- Sierra Leone Airport Security Operations
- Lungi Bridge Project
- Mamamah International Airport
- Hilton Garden Inn Freetown Airport
- Freetown Lungi Bridge
- Integrated and Resilient Urban Mobility Project
