SL-URBAN WATER SUPPLY
One of 1,061 projects Taiyo tracks in Sierra Leone.
Source: World Bank Group
The main objectives of the Urban Water Supply Project are to: 1) improve water supply and sanitation services in Freetown; 2) improve the accessibility of these services to the urban poor; and 3) ensure that water supply and sanitation services will be sustained by strengthening the sectoral institutions. Project components include: a) rehabilitation and repair work on Guma Dam intake tower and ra
- Status
- Closed
- Sector
- Water Supply and Storage, Automotive, Waste Processing and Treatment, Hydro, Government
- Location
- Sierra Leone
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SL-URBAN WATER SUPPLY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objectives of the Urban Water Supply Project are to: 1) improve water supply and sanitation services in Freetown; 2) improve the accessibility of these services to the urban poor; and 3) ensure that water supply and sanitation services will be sustained by strengthening the sectoral institutions. Project components include: a) rehabilitation and repair work on Guma Dam intake tower and raising of the spillway by 1.5m to increase storage; b) refurbishment of the Guma Water Treatment Plant including replacement of obsolete equipment, refurbishment of filters and other modifications to increase capacity to match the supply capacity of the Guma reservoir and transmission pipelines to Freetown; c) construction of new bulk transfer mains to the rapidly growing estern areas of Freetown;d) extensions to the distribution system to meet the projected 2005 demands; e) improvement of reservoirs, and provision of new reservoirs at Governor's Lodge, Kortright and Wilberforce Village; f) refurbishment of the subsidiary at Kongo, including provision of package treatment plant of 1600m/day capacity with the source of raw water from the Kongo Reservoir and replacement of the Old Gloucester Service Reservoirs; g) secondary distribution reinforcement; h) Guma Valley Water Company (GVWC) institutional strengthening; i) supply of computers and vehicles; j) technical assistance to implement computerized systems; k) training of GVWC staff; l) improvement of water supply operations in other major towns; m) sanitation including technical assistance to plan low cost sanitation including the design of a community outreach system involving NGOs and/or other private agencies; and n) rehabilitation and pilot scale extension of the existing sewerage system and extension of the outfalls. |
Original sector | FY17 - Water, Sanitation and Waste Management,Water, Sanitation and Waste Management |
Budget |
Location
Country | Sierra Leone |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Automotive, Waste Processing and Treatment, Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Sierra Leone
- Sierra Leone - Rehabilitation and Extension of Bo-Kenema Distribution System Project
- Sierra Tropical Limited
- Sierra Leone - Rice Agro Industrial Cluster (RAIC)
- Sierra Leone - Social Action Support Project (SASP)
- Port of Freetown Container Terminal
- Sierra Leone - Freetown Water Supply
- Sierra Leone - Three Towns Water Supply and Sanitation Project
- Moyamba Integrated Rural Development Project
