SL-URBAN WATER SUPPLY
Sector: Water Supply and Storage • Location: Sierra Leone
Source: World Bank Group
The main objectives of the Urban Water Supply Project are to: 1) improve water supply and sanitation services in Freetown; 2) improve the accessibility of these services to the urban poor; and 3) ensure that water supply and sanitation services will be sustained by strengthening the sectoral institutions. Project components include: a) rehabilitation and repair work on Guma Dam intake tower and ra
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The main objectives of the Urban Water Supply Project are to: 1) improve water supply and sanitation services in Freetown; 2) improve the accessibility of these services to the urban poor; and 3) ensure that water supply and sanitation services will be sustained by strengthening the sectoral institutions. Project components include: a) rehabilitation and repair work on Guma Dam intake tower and raising of the spillway by 1.5m to increase storage; b) refurbishment of the Guma Water Treatment Plant including replacement of obsolete equipment, refurbishment of filters and other modifications to increase capacity to match the supply capacity of the Guma reservoir and transmission pipelines to Freetown; c) construction of new bulk transfer mains to the rapidly growing estern areas of Freetown;d) extensions to the distribution system to meet the projected 2005 demands; e) improvement of reservoirs, and provision of new reservoirs at Governor's Lodge, Kortright and Wilberforce Village; f) refurbishment of the subsidiary at Kongo, including provision of package treatment plant of 1600m/day capacity with the source of raw water from the Kongo Reservoir and replacement of the Old Gloucester Service Reservoirs; g) secondary distribution reinforcement; h) Guma Valley Water Company (GVWC) institutional strengthening; i) supply of computers and vehicles; j) technical assistance to implement computerized systems; k) training of GVWC staff; l) improvement of water supply operations in other major towns; m) sanitation including technical assistance to plan low cost sanitation including the design of a community outreach system involving NGOs and/or other private agencies; and n) rehabilitation and pilot scale extension of the existing sewerage system and extension of the outfalls. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
