logo

SL-URBAN WATER SUPPLY

Sector: Water Supply and Storage • Location: Sierra Leone

Source: World Bank Group

Project
Closed

The main objectives of the Urban Water Supply Project are to: 1) improve water supply and sanitation services in Freetown; 2) improve the accessibility of these services to the urban poor; and 3) ensure that water supply and sanitation services will be sustained by strengthening the sectoral institutions. Project components include: a) rehabilitation and repair work on Guma Dam intake tower and ra

Project Information FAQ

Project Information

5 Q
The project “SL-URBAN WATER SUPPLY” is an infrastructure initiative in the Water Supply and Storage sector, located in Sierra Leone. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The main objectives of the Urban Water Supply Project are to: 1) improve water supply and sanitation services in Freetown; 2) improve the accessibility of these services to the urban poor; and 3) ensure that water supply and sanitation services will be sustained by strengthening the sectoral institutions. Project components include: a) rehabilitation and repair work on Guma Dam intake tower and raising of the spillway by 1.5m to increase storage; b) refurbishment of the Guma Water Treatment Plant including replacement of obsolete equipment, refurbishment of filters and other modifications to increase capacity to match the supply capacity of the Guma reservoir and transmission pipelines to Freetown; c) construction of new bulk transfer mains to the rapidly growing estern areas of Freetown;d) extensions to the distribution system to meet the projected 2005 demands; e) improvement of reservoirs, and provision of new reservoirs at Governor's Lodge, Kortright and Wilberforce Village; f) refurbishment of the subsidiary at Kongo, including provision of package treatment plant of 1600m/day capacity with the source of raw water from the Kongo Reservoir and replacement of the Old Gloucester Service Reservoirs; g) secondary distribution reinforcement; h) Guma Valley Water Company (GVWC) institutional strengthening; i) supply of computers and vehicles; j) technical assistance to implement computerized systems; k) training of GVWC staff; l) improvement of water supply operations in other major towns; m) sanitation including technical assistance to plan low cost sanitation including the design of a community outreach system involving NGOs and/or other private agencies; and n) rehabilitation and pilot scale extension of the existing sewerage system and extension of the outfalls.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data