logo
ProjectClosed

SL-URBAN WATER SUPPLY

One of 1,061 projects Taiyo tracks in Sierra Leone.

Source: World Bank Group

The main objectives of the Urban Water Supply Project are to: 1) improve water supply and sanitation services in Freetown; 2) improve the accessibility of these services to the urban poor; and 3) ensure that water supply and sanitation services will be sustained by strengthening the sectoral institutions. Project components include: a) rehabilitation and repair work on Guma Dam intake tower and ra

Status
Closed
Sector
Water Supply and Storage, Automotive, Waste Processing and Treatment, Hydro, Government
Location
Sierra Leone
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SL-URBAN WATER SUPPLY

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SL-URBAN WATER SUPPLY” is an infrastructure initiative in the Water Supply and Storage sector, located in Sierra Leone. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objectives of the Urban Water Supply Project are to: 1) improve water supply and sanitation services in Freetown; 2) improve the accessibility of these services to the urban poor; and 3) ensure that water supply and sanitation services will be sustained by strengthening the sectoral institutions. Project components include: a) rehabilitation and repair work on Guma Dam intake tower and raising of the spillway by 1.5m to increase storage; b) refurbishment of the Guma Water Treatment Plant including replacement of obsolete equipment, refurbishment of filters and other modifications to increase capacity to match the supply capacity of the Guma reservoir and transmission pipelines to Freetown; c) construction of new bulk transfer mains to the rapidly growing estern areas of Freetown;d) extensions to the distribution system to meet the projected 2005 demands; e) improvement of reservoirs, and provision of new reservoirs at Governor's Lodge, Kortright and Wilberforce Village; f) refurbishment of the subsidiary at Kongo, including provision of package treatment plant of 1600m/day capacity with the source of raw water from the Kongo Reservoir and replacement of the Old Gloucester Service Reservoirs; g) secondary distribution reinforcement; h) Guma Valley Water Company (GVWC) institutional strengthening; i) supply of computers and vehicles; j) technical assistance to implement computerized systems; k) training of GVWC staff; l) improvement of water supply operations in other major towns; m) sanitation including technical assistance to plan low cost sanitation including the design of a community outreach system involving NGOs and/or other private agencies; and n) rehabilitation and pilot scale extension of the existing sewerage system and extension of the outfalls.

Original sector

FY17 - Water, Sanitation and Waste Management,Water, Sanitation and Waste Management

Budget

Location

Country

Sierra Leone

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Automotive, Waste Processing and Treatment, Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project