Sleetmute School Replacement Project
Sector: Education • Location: Sleetmute, Alaska, United States
Source: Anchorage Daily News
Replacement of the school in Sleetmute due to additional damage beyond roof issues. The project was initially requested in 2007 and funded in 2025, with the current request for full replacement at a cost of $35 million.
- Status
- Prospective
- Sector
- Education
- Location
- Sleetmute, Alaska, United States of America
- Updated
- 19 Nov 2026
- Source
- Anchorage Daily News
ConstructChat
Ask ConstructChat about Sleetmute School Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | funding requested |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replacement of the school in Sleetmute due to additional damage beyond roof issues. The project was initially requested in 2007 and funded in 2025, with the current request for full replacement at a cost of $35 million. |
Original sector | Education |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Sleetmute |
Source
Source | Anchorage Daily News |
URL |
More Details
Record type | Project |
Sector | Education |
Article published date | 2026-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
