Sleipner Carbon Capture Project
Sector: Energy • Location: Norway
Source: RenewEconomy
Equinor's Sleipner project has been capturing CO2 from a gas processing plant since 1996, but recent data revealed that the actual amount captured is significantly lower than previously claimed. The project is part of Equinor's efforts to contribute to carbon capture and storage (CCS) technology, which is seen as essential for meeting climate goals.
- Status
- Under Construction
- Sector
- Energy
- Location
- Norway
- Updated
- 22 Jul 2026
- Source
- RenewEconomy
ConstructChat
Ask ConstructChat about Sleipner Carbon Capture Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Ongoing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Equinor's Sleipner project has been capturing CO2 from a gas processing plant since 1996, but recent data revealed that the actual amount captured is significantly lower than previously claimed. The project is part of Equinor's efforts to contribute to carbon capture and storage (CCS) technology, which is seen as essential for meeting climate goals. |
Original sector | Energy |
Location
Country | Norway |
Source
Source | RenewEconomy |
URL |
More Details
Record type | Project |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
