Sleipnir North Atlantic Transit Optimization
Sector: Seaport
Source: Cyprus Shipping News
Heerema Marine Contractors shortened the North Atlantic transit of its semi-submersible crane vessel Sleipnir by 2.5 days using a data-driven voyage optimization pilot with French ocean intelligence company Amphitrite. The optimized crossing reduced the sailing distance by 240 nautical miles and cut CO₂ emissions by up to 18%, while maintaining higher average speeds without increasing fuel consump
- Status
- Closed
- Sector
- Seaport
- Updated
- 22 Jul 2026
- Source
- Cyprus Shipping News
ConstructChat
Ask ConstructChat about Sleipnir North Atlantic Transit Optimization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Heerema Marine Contractors shortened the North Atlantic transit of its semi-submersible crane vessel Sleipnir by 2.5 days using a data-driven voyage optimization pilot with French ocean intelligence company Amphitrite. The optimized crossing reduced the sailing distance by 240 nautical miles and cut CO₂ emissions by up to 18%, while maintaining higher average speeds without increasing fuel consumption. The project involved vessel-specific voyage optimization combining operational data and high-resolution ocean intelligence to improve transit efficiency and reduce emissions. |
Original sector | Maritime |
Location
| Not available for this record. |
Source
Source | Cyprus Shipping News |
URL |
More Details
Record type | Project |
Sector | Seaport |
Article published date | 2026-07-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Seaport projects
- Projet 18e - Porte de Clignancourt
- Protocole d'accord RATP/Ville de Paris: création de 2000 logements d'ici 2024
- Chapelle Dubois Condorcet
- Projet 16e - 17e - Porte Maillot
- San Pedro Waterfront Connectivity Plan
- Canada Post Pacific Processing Centre
- Maritime Helicopter Support Facilities - 12 Wing Shearwater
- Residue Storage Areas and Dams
