SLGP SBL RSF
The status, timeline and source of this project. A free account opens every field.
Source: International Finance Corporation (IFC)
The proposed project consists of an unfunded risk sharing facility (RSF) on a 50:50 basis between IFC and Siddhartha Bank Limited (Bank) in Nepal to support up to US$40 million Nepalese rupee (NPR) equivalent of eligible MSME loans to be originated by the Bank (the Project). IFC's maximum risk amount will be up to US$20 million NPR equivalent. The Project provides the Bank with a credit risk mitig
- Status
- Prospective
- Sector
- Warehouse, Waste Processing and Treatment, Manufacturing (Industrial), Commercial, Government
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about SLGP SBL RSF
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project consists of an unfunded risk sharing facility (RSF) on a 50:50 basis between IFC and Siddhartha Bank Limited (Bank) in Nepal to support up to US$40 million Nepalese rupee (NPR) equivalent of eligible MSME loans to be originated by the Bank (the Project). IFC's maximum risk amount will be up to US$20 million NPR equivalent. The Project provides the Bank with a credit risk mitigation instrument to help increase access to finance for MSMEs, including women-owned MSMEs (WMSMEs) and climate MSMEs. It is the first time that IFC is doing an RSF in Nepal.Subject to eligibility confirmation, the Project would be processed under IFC's Small Loan Guarantee Program (SLGP, the Program), a programmatic approach to derisk and scale up financing for SMEs in Nepal and other eligible countries. SLGP is supported by a pooled first-loss guarantee (PFLG) provided by the IDA-PSW Blended Finance Facility. |
Original sector | O-AE - Commercial Banking - Risk Mgmt Facility |
Budget |
Location
Country | Nepal |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Warehouse, Waste Processing and Treatment, Manufacturing (Industrial), Commercial, Government |
Article published date | 2026-01-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Warehouse projects in Nepal
- Emergency Flood Damage Rehabilitation Project
- Harnessing Bamboo Industries for Green Growth and Climate Action
- South Asia Subregional Economic Cooperation Highway Enhancement Project (Kakarbhitta-Laukahi)
- Kosi Hydroelectric Project Vehicle Tax Waiver
- SLGP LSL RSF
- Fairfield-KTM
- LS Senior Loan
- Earthquake Housing Reconstruction Project
