Slick City Action Park
Sector: Energy Storage • Location: Wauwatosa, Wisconsin, United States of America
Source: Dodge USA
Slick City in Wauwatosa will be in about 50,000 square feet of former warehousing space with 12 slides, sports courts with bouncy surfaces for enhanced basketball, four-level tall playground structure with soft surfaces for younger kids, along with a 20-foot by 15-foot web crawler with netted swings and ways for kids to climb around. Miniature battery-powered go-carts will run on a 3,000-square-fo
- Status
- Under Construction
- Sector
- Energy Storage, Warehouse, Car parking, Consumer Products, Power Generation (CCGT), Automotive, Commercial, Raw Materials
- Location
- Wauwatosa, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Slick City Action Park
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Slick City in Wauwatosa will be in about 50,000 square feet of former warehousing space with 12 slides, sports courts with bouncy surfaces for enhanced basketball, four-level tall playground structure with soft surfaces for younger kids, along with a 20-foot by 15-foot web crawler with netted swings and ways for kids to climb around. Miniature battery-powered go-carts will run on a 3,000-square-foot track at speeds of up to 10 miles per hour. An overhead zip line will offer a 50-foot ride end... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Wauwatosa |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Warehouse, Car parking, Consumer Products, Power Generation (CCGT), Automotive, Commercial, Raw Materials |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 9.6 KW 24 MODULES AND 13.5 KWH ENERGY STORAGE SYSTEM N 225A LOAD CENTER
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 7.02 KW 18 MODULES AND 1 CHEM BATTERY AT 9.8KWH
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.78 KW 13.5KH ENERGY STORAGE SYSTEM
- INSTALL (16) TILTED 355W MODULES AT 5.68 KW TOTAL. INSTALL ( 1) TESLA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL TESLA SOLAR ROOF 13.92 KW 27 KWH ENERGY STORAGE SYSTEM NEW 225A DISTRIBUTION PANEL
- ROOFTOP PV SOLAR PANEL INSTALL (21) 400W MODULES AT 8.4 KW T OTAL. INSTALL (1) LG CHEM BATTERY AT 9.88 KWH CAPACITY
- ROOFTOP SOLAR PANEL INSTALL: (10) 400W MODULES AT 4.0 KW TOT AL. INSTALL (1) LG CHEM BATTERY AT 9.8 KWH CAPACITY.
