logo

SLMUD 6-Inch Water Line Improvements Phase III

Sector: Waste Processing and Treatment • Location: Dickinson, Texas, United States of America

Source: Dodge

Project
Bid Results

The work in this contract is for the 6-Inch Water Line Improvements Phase III for San Leon Municipal Utility District located in San Leon, Texas. The purpose of this project is to replace and upsize aging water lines in the San Leon Municipal Utility District, including gate valves and fire hydrants, to prevent future water main breaks and provide better service to the affected areas.

Status
Closed
Sector
Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Government
Location
Dickinson, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about SLMUD 6-Inch Water Line Improvements Phase III

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SLMUD 6-Inch Water Line Improvements Phase III” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Dickinson, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work in this contract is for the 6-Inch Water Line Improvements Phase III for San Leon Municipal Utility District located in San Leon, Texas. The purpose of this project is to replace and upsize aging water lines in the San Leon Municipal Utility District, including gate valves and fire hydrants, to prevent future water main breaks and provide better service to the affected areas.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Dickinson

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Government

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project