Slocum Trail Culvert Replacement
Bid results · North Carolina · Last reported Sep 2025
Source: Dodge
- Implementation of traffic management plan and erosion control plan 2. Select demolition of existing roadway and culvert. 3. Installation of new corrugated aluminum structural plate pipe arch culvert with aluminum end walls. 4. Construction of new roadway.
- Status
- Closed
- Sector
- Water Supply and Storage, Rail, Metal, Mass Transit, Steel, Waste Processing and Treatment, Car parking, Automotive, Commercial, Road
- Location
- Wilmington, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Slocum Trail Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. Implementation of traffic management plan and erosion control plan 2. Select demolition of existing roadway and culvert. 3. Installation of new corrugated aluminum structural plate pipe arch culvert with aluminum end walls. 4. Construction of new roadway. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Wilmington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail, Metal, Mass Transit, Steel, Waste Processing and Treatment, Car parking, Automotive, Commercial, Road |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
